Seaford
Value-Engineered Foundation Solution for Challenging Sloping Site in Seaford
This multi-unit development in Seaford presented a unique set of geotechnical challenges. The sloping site, coupled with stringent flood level requirements, necessitated a significantly raised floor level. This demanded a foundation solution that was both structurally sound and cost-effective.
Our engineers collaborated closely with the builder to develop an optimized foundation design utilizing Bondek slabs on strip footings. This approach effectively addressed the sloping terrain and flood requirements while minimizing excavation and material costs.
This project demonstrates our commitment to value engineering and collaborative problem-solving. By working closely with the builder, we delivered a structurally sound and cost-effective foundation solution that met the unique challenges of this demanding site.