Dual Occupancy Project with Basement – Overcoming Groundwater Challenges in Black Rock, Melbourne

A dual occupancy project in Black Rock, Melbourne, presented an unexpected challenge during the basement excavation—groundwater seepage that had not been flagged in the initial soil report. This surprise put the project at risk, demanding a swift response to keep things on track.


The design team quickly pivoted, redesigning the basement slab to withstand hydrostatic pressure. This solution required seamless coordination between the builder, geotechnical engineer, and client. Regular communication and collaboration were essential to manage concerns, adjust timelines, and ensure the project moved forward efficiently.


Despite the initial setbacks, the team’s proactive approach and problem-solving expertise turned a potential delay into a success. The redesigned basement slab was completed, providing a robust solution to handle the groundwater pressure and keep the project on course.